The InterDam project team has started with the installation of our G21 Fire Panels, G21 Fire Doors and G21 Fire Windows on the topside for the Borkum Riffgrund 2 offshore wind farm. The items are installed per deck ensuring maximum fire protection on the platform which is planned to sail away for its offshore destination in May 2018.