The Rampion OSS Topside was installed at the coast of Sussex (UK). This E.ON Offshore Windfarm Project is due to be completed and operational in 2018. InterDam supplied and installed A60 and H120 fire resistant sandwich panels “G21 Fire Panels”, single hinged A60 Fire Door and insulation for the Rampion substation.