The topside for the offshore substation of the Merkur Offshore Wind Farm was installed last week. The topside has 4 decks, is 20 meters tall, weighs 2,500 tonnes and has an output capacity of 396 MW. InterDam have supplied for the Merkur substation the full architectural package (G21 Fire Panel, G21 Fire Door and G21 Fire Window). For more information about our products? Take a look at www.G21firepanel.com and www.G21firedoor.com