The Pemex CA-KU-A1 platform has sailed away from Dragados Offshore’s Altamira yard in Mexico for floatover installation in the Bay of Campeche.
The CA-KU-A1 platform, with a weight of 21,500 metric tons, is expected to commence offshore production in December 2019.
InterDam supplied H120 and H60 fire/1 bar blast walls, which will take care of the passive fire protection, for the production of Pemex’s CA-KU-A1 platform.