News

By interdam

Petrogas E&P Netherlands B.V. embraces InterDam’s maintenance capabilities

Petrogas E&P Netherlands B.V. (hereafter: PEPN) and InterDam have entered into an agreement for engineering, inspection, maintenance and repair work of fire/blast resisting architectural components of PEPN Northsea offshore facilities on the Dutch Continental Shelf.
With the extensive knowledge and experience of InterDam in the field of blast- and fire resistance the contract is well placed and serves the needs of Energy operators. Interdam has supported PEPN in their operations over the last decades. As recognition of InterDam’s value, this has resulted in an extension of our existing Service Contract.

With a vision to be an internationally reputable Operator and a partner of choice, PEPN is well-placed to embrace a journey of ambitious growth. With its robust track record, streamlining project delivery is a culture in PEPN, built on well-founded technical competencies and deeply rooted values.
InterDam’s mission is to provide high-quality products that create safe working conditions for people in on- and offshore hazardous environments across the globe. To do this, we design and create standard and customized products, to be their Shield in the Field.

Summer Campaign

Summer Campaign

Summer season is the perfect time to execute offshore maintenance and refurbishment activities. Offshore work at this time of year is safer and faster, that is what everybody wants, right? Over the past years we noticed that the demand for our doors, cladding and all...

InterDam’s perspective on safe tunnel doors.

InterDam’s perspective on safe tunnel doors.

The lack of space and urban needs have accelerated the digging of tunnels and underground spaces. Today the world digs 5.200 kilometers of tunnels per years. The world builds tunnels but it also need to make them safe for users.  InterDam’s perspective on safe...

Proud to be a piece of this puzzle

Proud to be a piece of this puzzle

Tyra II is Denmark’s new high-tech hub for natural gas production in the Danish North Sea. A redevelopment of the Tyra field is was necessary due to the field’s natural subsidence after many years of production. The platforms have sunk nearly 5 meters over the past 35...

InterDam B.V. Head Office

InterDam B.V.
Klompenmakerstraat 12
2984 BB Ridderkerk
The Netherlands
T: +31 (0) 180 470030

We care about your privacy.

en_USEnglish